
Your villa from drawings to keys, one point of contact
Architecture, structure, construction, interiors and windows in one contract and one estimate. You do not coordinate four contractors.
What Tropicity does on a villa
- Architecture and 3D renders so you see the house before it is built.
- Structural design by a structural engineer, for the real soil and loads.
- Construction: structure, finishes, mechanical and electrical.
- Turnkey interiors made in our CNC workshop: kitchens, wardrobes, living rooms, bedrooms, studies.
- Aluminium and timber doors from our own workshop, sized from the architectural drawings.
- Landscape: paving, lawns, garden lighting, pergolas.

Why villa owners choose design-build
Most construction disputes are about payment and schedule, and design changes halfway through are a common reason budgets overrun. Design-build addresses exactly those two points.
Know the total upfront
Construction, interiors and windows in one estimate, fixed before work starts. No gaps between contractors.
Workshops run in parallel
Joinery and windows are made while the building goes up and installed as soon as each area is ready.
No finger-pointing
A door that does not fit its opening or a kitchen that misses the plumbing is Tropicity's problem, not yours.
A family home designed room by room
Interior renders by Tropicity's architects in 2025: kitchen, living room, study and bedrooms.




How much does a turnkey villa cost?
Vietnamese press puts high-end turnkey villas at roughly VND 10–15 million per m² of floor area (VietNamNet). Your real figure depends on:
Structure and soil
Number of floors, basement, spans, foundation type from the soil survey.
Finish level
Flooring, tiling, sanitary ware, window systems and glass.
Interiors
Scope of joinery, board and veneer type, hinges and runners.
Site
Truck access, building density rules, setbacks.
That is why we ask for the site address before giving a range. An engineer replies within one working day and sends a budget range within 48 hours.
Send your site addressQuestions we get before signing
What owners ask a design-build contractor in Vietnam, and how Tropicity answers.
Does "turnkey" include the furniture?
It depends on the contractor, and this is the most common misunderstanding. For most firms turnkey means the building finished — structure, walls, floors, paint, basic sanitaryware — while kitchen units, wardrobes, beds and loose furniture are priced separately.
At Tropicity the furniture and windows come from the company's own workshops, so they can sit inside the same contract as the construction. Whichever route you take, have the contract state which packages are in and which are out — see questions to ask before signing.
Are the foundations included in the rate per square metre?
Foundation works — excavation, pile caps and ground beams — are normally inside the turnkey rate, applied through the area coefficient. Piling is separate, because the quantity follows the ground conditions rather than the floor area. Two identical houses, one on firm ground with pad footings and one on soft ground needing piles, differ considerably below ground level.
Tropicity prices piling outside the turnkey rate, by the quantity actually driven after the ground investigation. When comparing quotes, ask whether the rate includes foundations, how piling is charged, and to see the area coefficient sheet.
What does a villa cost per square metre?
There is no single figure. The rate moves with ground conditions and the foundation solution, the number of storeys and structural spans, the finish level (which tiles, stone and sanitaryware), whether there is a pool, lift or landscaping, and access to the site — whether a truck can reach it or material has to be transferred to small vehicles.
Tropicity asks for the site address and the intended size first, then sends an indicative range within 48 hours. Send the project details.
Is design-build more expensive than hiring trades separately?
On paper, adding up separate quotes usually gives a lower number. In practice the difference shows up in items that were never quoted: the owner's own time coordinating, idle time when one trade cannot start until another finishes, and rework where packages do not meet — a kitchen run built before anyone checked the socket positions, for instance.
Tropicity has written this up: design-build or separate contractors?
What is covered by a full contract?
Normally five packages: design and the permit application; substructure (foundations, basement if any); structure and first fix (frame, blockwork, concealed services); finishes (paint, tiling and stone, sanitaryware, ceilings); and handover with as-built sign-off. Loose furniture and windows may sit inside or outside, depending on the contract.
How long does a villa take?
It follows the size and the foundation solution, but the stage owners most often forget is everything before work starts: design, revisions and the permit. Many projects run late not because site work was slow but because that stage stretched.
Tropicity writes stage sign-off dates into the contract, with terms covering delay.
We already have an architect's drawings — will you build to them?
Yes. Tropicity builds to an existing design package, or takes on design and construction together. If you have drawings, send them and the engineers will take off quantities and price against those drawings.
Worth reading before signing
Notes from Tropicity's engineers for owners comparing quotations.
Get our company profile and a budget range within 48 hours
Tell us where your project is and what you plan to build. A Tropicity engineer replies within one working day and arranges a site visit in Ho Chi Minh City and the southern provinces.
- One contract, one estimate, one point of contact
- A structural engineer visits your site
- English-speaking contact; no marketing emails
Why the site address? Planning rules, building density and truck access change the price. Without the address an estimate is only a generic figure.