10 questions to ask before signing a design-build contract
A design-build contract for a villa or factory runs for months and is worth billions of dong. According to an analysis in the Vietnam Lawyers Journal, construction disputes centre on payment and schedule. Most of them can be avoided if both sides ask and write things down at the start.
These are the 10 questions we suggest owners ask any contractor, including Tropicity.
The estimate
1. What does this estimate include, and what does it leave out?
The most important question. A cheap estimate can be cheap only because items are missing: external works, waterproofing, fire systems, built-in joinery, doors. Ask for the exclusions in writing, attached to the contract.
2. Which drawings, and which revision, is the price based on?
An estimate should be tied to a dated, numbered set of drawings. When the drawings change, everyone knows which estimate still applies.
3. Are materials specified by brand, model and grade?
"High-grade tiles" and "good paint" invite misunderstanding. Ask for the brand, product line and specification, or a maximum material price per item.
Payments and variations
4. Which inspection milestones are payments tied to?
Payments should follow inspected progress (foundations, frame, roof, finishes), not just dates. Both sides then have a reason to keep to schedule.
5. How are variations priced and approved?
Design changes halfway through are a common reason costs overrun (CafeF). The contract should say every variation needs a written quote signed by the owner before work starts.
6. Is the price fixed if material prices rise?
Ask whether the contract is a fixed lump sum or adjustable, and if adjustable, for which materials and against which index.
Schedule
7. Is there a detailed programme by work package?
"Six months" is not enough. Ask for a programme with each package and milestone so you can check every week whether the job is ahead or behind.
8. Which packages depend on third parties?
Windows, joinery, lifts and equipment are often supplied by others, and that is where schedules stall. Ask who is responsible when a third party delivers late.
People and after handover
9. Who is technically responsible, and can I meet them?
Meet the structural engineer and the site manager, not only the sales team. Ask to see a finished project, ideally one similar to yours.
10. What does the warranty cover, for how long, and how are claims handled?
Warranties for structure, waterproofing, windows and joinery usually differ. Ask for each period in writing, the response time for defects and a named contact.
In short
A good contractor will not mind these questions, because the answers are already in their documents. If the answers are vague, stop before you sign.